3200 S. Intersection

Click here for more information

Design Phase

Background
UDOT has allocated funding for the design and construction phases of this project. The proposed project will realign 3200 S to connect with 3000 S at a new signalized intersection, as shown above. This alignment has been identified as the preferred alignment after numerous meetings between UDOT and the local governments, as well as public input.

Project will be constructed Spring\Summer 2023

Skip to content